服务热线:
18971017202
您的位置:首页 >> 新闻中心

Sb2O3 Masterbatch for Flame-Retardant ABS/PVC Power-Tool & Battery Housings

发布日期:2026-11-21 05:36:07   浏览量:0

Why Masterbatch for Impact-Critical Housing Grades

Power-tool bodies, battery-pack housings and handheld appliance shells are injection-moulded from ABS (often ABS/PC) or rigid PVC, and must pass both UL94 V-0 and pass a drop/impact test. Adding Sb2O3 as loose powder degrades toughness and leaves white specks at the thin walls. An ABS- or rigid-PVC-carrier Sb2O3 masterbatch keeps dispersion fine, metering exact and lot-to-lot consistency — the three things that hurt impact retention on tool housings.

Dose & Synergy Window (recalculate on effective halogen)

  • Use effective Sb2O3 at 3–5 ph. phr (on 100 parts resin) for ABS; 3–5 phr for rigid PVC power housings.
  • With a brominated FR (decabromodiphenyl ethane / brominated epoxy oligomer) target Br:Sb ≈ 3:1 on effective bromine; for chlorinated PVC bases use Cl:Sb ≈ 3:1 with chlorinated paraffin CP-52/70.
  • Optional zinc borate at 30–50% of the Sb2O3 loading to cut smoke and afterglow without losing the V-0.

Carrier, Moisture & Processing Checks

  • Match the masterbatch carrier to the resin polarity/MFI (ABS/SAN carrier for ABS; rigid-PVC K58-65 or EVA-CPE carrier for PVC).
  • Pre-dry before moulding: ABS/PC 2–4 h at 80–90 °C, target moisture <0.02%; rigid-PVC pre-dry 2–4 h at 70–80 °C when storage >60% RH. Moisture is the #1 cause of splay/silver streaks that become crack-initiation points in drop tests.
  • Keep melt below ~220 °C (ABS) / ≤190 °C (PVC); run a plate-out / mould-fouling check on long cycles and set a cleaning schedule.
  • Dispersion QC: mould a 1.5–2.0 mm plaque, verify no visible specks and that notched-Izod/Charpy retains ≥85% of the unfilled control.

End-Product Qualification

  • Run UL94 V-0 at the final wall thickness (usually 1.5–3.0 mm), not on thick bars.
  • Add the tool-specific drop test from 1 m at −10 °C and a battery-crush/no-fire test if the part houses cells.
  • Heat-age 70–105 °C 7 days; confirm no surface bloom (Sb2O3 migration) and gloss retention.

CoA Acceptance Checklist

Per lot require CoA stating: purity ≥99.5%, moisture <0.3%, particle size D50 0.8–1.5 µm (and D97), Pb <50 ppm, Fe <100 ppm, whiteness ΔE <1 vs reference. Keep a 200 g per-lot retained sample for 12 months; link CoA lot ↔ test report ↔ retained sample ↔ delivery batch for traceability ≥5 years. Line-trial qualify every new lot before batch commit; add annual requalification.

在线咨询 联系方式 二维码

服务热线

18971017202

扫一扫,关注我们