服务热线:
18971017202
您的位置:首页 >> 新闻中心

Sb2O3 Masterbatch for Glass-Reinforced PA66 Cooling Fans, Shrouds & Structural Housings

发布日期:2026-11-21 05:36:13   浏览量:0

Why masterbatch over dry powder for these parts

Cooling-system housings and shrouds are thin (±2–3 mm) glass-reinforced PA66 parts run at high fan speeds with continuous vibration and under-hood heat. Dry Sb2O3 powder here causes three chronic failures: white specks on dark matte surfaces, uneven flame-retardant dose lot-to-lot, and dust contamination of connectors/electrical contacts beside them. A PA-carrier Sb2O3 masterbatch gives clean dosing, uniform dispersion across the glass-fibre matrix, and per-lot consistency you can CoA-verify before you run.

Masterbatch & carrier selection

  • Carrier: PA66 homopolymer masterbatch at 40–50% Sb2O3 loading is preferred — it melts in-resin with the base polymer, avoiding carrier-polymer phase mismatch that dry-additive routes create in glass-filled parts.
  • Halogen–antimony synergy: Br:Sb ≈ 3:1 calculated on effective bromine in the brominated FR (e.g. brominated epoxy or brominated polystyrene), not on compound weight. For PA66/PPE blends, retune the ratio because the second phase changes bromine efficiency.
  • Glass-fibre compensation: glass loading dilutes the polymer fraction that carries the flame retardant. Dose the effective Sb2O3 on the polymer fraction (typically 3.5–5 wt%) so the end-part UL94 class holds on the finished wall, not on an unfilled plaque.

Drying & process windows

  • Pre-dry the masterbatch and resin to <0.2% moisture — PA66 hydrolyses above that and impacts/CTI drop irreversibly. 80–90°C, 3–4 h, hopper-dryer or vacuum.
  • Melt ≤290°C for PA66 (brominated epoxy oligomers degrade above ~325°C → discolouration and premature bromine release). Watch screw-back time to avoid thermal residence.
  • Moulding: check surface plate-out / mould-fouling on short shots at 2–4 h intervals; fine-grade D50 0.8–1.5 µm Sb2O3 slows cavity bloom and lengthens the cleaning cycle.

End-product verification (on the finished part, not the coupon)

  • UL94 V-0 at the actual housing wall thickness (1.6 / 2.5 / 3.0 mm as-built), plus CTI ≥ 600 V for parts adjacent to live terminals.
  • Impact retention ≥ 85% of unfilled baseline after adding the FR package — glass + FR + Sb2O3 must not embrittle thin walls.
  • Vibration / fatigue sine sweep at 10–500 Hz and −40 °C cold-crack on the finished shroud.
  • Heat ageing 85–105 °C for 1000 h, then re-check impact and colour ΔE < 1 (no halogen out-gassing bloom).
  • Heavy-metal migration screening for parts in airflow that could reach cabin interiors.

Supplier qualification checklist (CoA per lot)

Purity ≥ 99.5% Sb2O3 | Moisture < 0.3% | D50 0.8–1.5 µm | Pb < 50 ppm | Fe < 100 ppm | Whiteness ΔE < 1. Keep a 200 g retained sample per lot for 12 months, bind batch number ↔ CoA ↔ finished-part traceability for ≥ 5 years, and re-qualify the masterbatch annually or after any carrier/FR change.

在线咨询 联系方式 二维码

服务热线

18971017202

扫一扫,关注我们