Application context
PVC-insulated power and control cables use separate insulation and sheath formulations. Sb2O3 masterbatch loading must be tuned per layer, not blanket-applied.
Dosing guidance
- Insulation layer: 3–5 phr Sb2O3 (effective) with halogen source, Cl:Sb ≈ 3:1 molar.
- Sheath layer: 5–8 phr where heavier flame duty (IEC 60332) applies; plasticizer-rich flexible PVC.
- Use masterbatch with declared plasticizer content (DINP/DOA ratio) to match the base compound.
Key checks
- Plasticizer migration / blooming: soft PVC exudes plasticizer + Sb2O3 over time; fine-grade D50 0.8–1.5µm reduces surface bloom.
- Insulation resistance: moisture <0.3% in carrier; absorbed water drops dielectric stability. Pre-dry 2–4h at 70–80°C if storage >60% RH.
- Plate-out watch: melt ≤190°C on twin-screw or two-roll; monitor die build-up and screen pressure.
- Cl:Sb retune with brominated FRs: if Br source (DBDPE) replaces CP, recalculate Br:Sb ≈ 3:1 on effective bromine, not compound weight.
Supplier CoA qualification
- Purity ≥99.5%, moisture <0.3%, D50 0.8–1.5µm, Pb <50ppm, Fe <100ppm, whiteness per lot.
- Per-lot retained sample 200g, 12 months; annual re-qualification.
QC trial
- Two-roll dispersion check, LOI / vertical-burn (IEC 60332-1) on finished cable, cold-bend −20°C, dielectric strength per lot before release.