1. Application context
Nitrile (NBR) and hydrogenated nitrile (HNBR) are the workhorses for fuel hoses, hydraulic lines and rotating-shaft oil seals where oil/fuel resistance, low-temperature flexibility and high-temperature aging matter. Adding Sb2O3 via masterbatch — instead of loose powder — is the recommended route on these compounding lines: it removes dust, fixes the dose per batch, and keeps dispersion uniform in a polar rubber matrix.
2. Carrier matching
- Use an NBR/HNBR-compatible carrier, not a generic polyolefin: the masterbatch must fuse into the rubber phase, not sit as discrete particles that read as contamination on the seal lip or hose wall.
- Match the carrier's acrylonitrile (ACN) level to the base rubber where possible, or use a low-viscosity NBR/EVM carrier. Declare the ACN content so the compounder can confirm compatibility.
- Verify Mooney viscosity (ML 1+4 @ 100°C) of the masterbatch pellet vs base polymer; a mismatch > ±15% changes mixing torque and dispersion.
3. Dosage and halogen–antimony synergy
- Target effective Sb2O3 at 3–6 phr for hoses and seals, with a halogen source at roughly 3:1 molar halogen:antimony.
- Chlorine route: chlorinated paraffin (CP-52/70) or PVC-nitrile blends. Bromine route: DBDPE / brominated phenolic for HNBR where heat-aging rating dominates.
- Do not exceed the loading window that preserves the rubber's oil-swell and low-temperature properties; seals tolerate less loading than hoses because compression-set and lip contact are critical.
4. Cure-interference check (red line)
- Both peroxide and sulfur cure systems are used on NBR/HNBR. Sb2O3 itself is inert in most cure systems, but the carrier additives can shift scorch.
- Run MDR (moving-die rheometer) t90 on the masterbatch-loaded compound; a shift > 10–15% from the powder-control recipe is a rejection line — retune the carrier or dose.
5. Dispersion and bloom control
- Use fine grades (D50 0.8–1.5 µm) so particles do not surface-bloom on the seal lip or create a rough hose bore.
- Pre-dry masterbatch 2–4 h at 70–80 °C when stored above 60% RH; moisture causes porosity and cure defects.
- Two-roll mill dispersion check per lot; look for white specks and unbroken agglomerates in a thin cross-section.
6. End-product verification
- Compression set (22 h/150–175 °C, red line ≤ 10%) on cured seal plaques.
- LOI / vertical-burn on the cured tube-and-cover (not on raw compound) per the relevant hose standard.
- Oil-swell (% volume change) in IRM 903 / reference fuel per ASTM D471, and cold-bend at −20 °C for hoses.
- Hardness (Shore A) and tensile retention after 135 °C / 168 h heat aging — drop < 10%.
7. CoA checks per lot
Purity ≥ 99.5%, moisture < 0.3%, Pb < 50 ppm, Fe < 100 ppm, D50 0.8–1.5 µm, whiteness ΔE < 1. Retain 200 g per lot for 12 months; annual re-qualification.